The Title Cielo Rawai: piling and structural works 100%, architecture 93.5%.
Developer update: piling works and load-bearing structures are fully complete, architectural works are at 93.5%, and MEP (mechanical, electrical, plumbing) systems are at 98%. The building is heading into the home stretch.