Construction of The Title Adora Rawai in Rawai is on schedule. As of September 2026, the project's overall completion has reached 59%.
Piling works are 100% complete, and the structural works are at 96%. Architectural works are at 34%, and installation of engineering systems (MEP) is at 43%.